Knitted shorts. Description and diagrams

For (3) 6 (9-12) 18-24 months. Dimensions of the finished product: waist circumference - (49) 52 (55) 58 cm.

You will need: Sandnes Mandarin Petit yarn (100% cotton, 180 m) - (100) 100 (100) 150 g gray, 50 g white, circular needles No. 2.5 and No. 3, sock needles No. 3, elastic band width 2 cm.

Front surface: persons. rows of persons. loops, out. rows - out. loops; for circular knitting - only faces. loops.

Knitting density: 27 sts persons. iron on knitting needles # 3 = 10 cm.

Shortened rows: knit the specified number of loops according to the pattern, remove the next loop as out. Then place the yarn between the knitting needles on the front of the work, remove the loop back to the left knitting needle. Rotate knitting, move thread to faces. side between the needles. Knit the loops back. In the next row, to hide the holes at the turn, work the loops as pattern before turning, then stick the right knitting needle into the turn loop as you would for knitting faces. loops and knit it together with the loop on the knitting needles of the faces.

Knit in a single piece from top to bottom. On circular knitting needles No. 2.5 with a gray thread, cast on (132) 140 (148) 156 p., Knit round the faces. satin stitch 2.5 cm. Then knit 1 row out. loops (for hem), then all calculations are carried out from this row. Mark 1 st in the middle of the front and back so that both sides are (65) 69 (73) 77 sts. Change knitting needles to # 3 and continue knitting faces. satin stitch, knitting shortened rows on the back, as described above, as follows: knit faces. p., knitting 7 sts after the marked loop, turn the work, knit back 14 sts, turn the work, knit 7 sts more than the previous row, turn the work. Continue this way, knitting 7 sts in each row more (4) 4 (5) 5 times on each side. Next, knit on all loops around the faces. satin stitch. At work height (14) 15 (16) 17 cm, add 1 sts on both sides of each marked loop in each row (4) 5 (6) 6 times = (148) 160 (172) 180 sts.

Then divide the fabric in half from the center of the front and back parts = (74) 80 (86) 90 p. Then knit each leg separately.

Transfer the stitches to the toe knitting needles and continue to knit around the faces. stitch 2 cm straight. Then subtract from the inside of the loop as follows: knit 1. p., 2 p. together persons., then knit persons. p. until 3 sts remain until the end of the row, knit 2 sts together. broach (= remove 1 p. as persons., knit 1 person. p. and pull it through the removed loop), 1 person. p. Repeat decrements in every 2nd row (0) 3 (2) 4 times = (72) 72 (80) 80 p. At leg height (6) 7 (8) 9 cm, knit a row of lace holes as follows : knit * 2 sts together persons., yarn over *, repeat * - * to the end of the row. Work 1 more row of faces. loops. After that, change the thread to white and tie the border with an openwork pattern according to the scheme (see instructions for the tunic with a heart). After completing the pattern, close the loops as faces. Tie the other leg in the same way.

Assembly: fold the top edge to the inside. row, hem. Insert the elastic. Twist 2 strings of white yarn each 50 cm long and pass through the row of holes on the leg.

Today we have Bay Shorts from Drops Design Knitted Boy Shorts. The description of this model is compiled for a child from birth to 6 years old. They are knitted from yarn, which consists of alpaca and silk, which means that thanks to this composition, you get not only a warm thing, but also a hypoallergenic one.

I would like to draw your attention separately to knitting strings. Think well, because if your baby is not yet able to tie it on its own, it may be worth giving it up and inserting an ordinary wide elastic band into the belt.

Sizes for age: 1/3 - 6/9 - 12/18 months (2 - 3/4 - 5/6 years)

Dimensions in cm: 56/62 - 68/74 - 8O / 86 (92 - 98 / 1O4 - 11O / 116)

BabyAlpacaSilk Drops yarn (alpaca / silk; 50gram = 167m) 2-2-2 (3-3-3) skeins No6235 gray blue.

Knitting needles 3 and 2.5 mm for hosiery and circular (40 or 60 cm)

Density:

24pt and 32p in A1 pattern = 10x10 cm with 3mm needles

Tie holes:

Start from the center of the back, knit 54-58-62 (66-7O-74) pt with front stitching, close 2pt and knit 8pt with front stitch (= middle of the front), close 2pt and knit 54-58-62 (66- 7O-74) n front stitching. In the next circle, in place of the closed 2 loops, dial 2 new ones.

Backrest rise:

We continue to work with pattern A.1 in straight rows: start from the center of the back and knit 5-5-5 (7-7-7) pt with a pattern, turn, tighten the thread and knit back 10-10-10 (14-14-14) ne pattern. Turn the part, tighten the thread and knit 18-18-18 (24-24-24) sts, turn, tighten the thread and knit back 26-26-26 (34-34-34) sts. Continue in this way, knit 8-8-8 (10-10-10) ne more 4 more times (= total of 8 shortened rows). Then turn the piece and knit back to the middle of the back.

Increases:

Start when there is 1 loop left in front of the marking thread, make 1 yarn over, continue along A.1 on the next. 2 sts (= middle front or back), 1 nakid. (= Fri added). In the next. a row of loops that have been added to knit according to pattern A.1 with crossed loops.

Decreases (for the inside of the leg):

Decreases after thread mark:

When the first loop is front: remove 1 loop., Like a front loop, 1 person., Throw the removed loop over the knitted one.

When purl 1: 2 in place of purl behind back walls.

Decreases before mark thread:

When the last buttonhole is knit: 2 loops together.

When the last loop is purl: purl 2 together.

Knitted baby shorts for a boy from birth to 6 years old, a description of how to knit:

The shorts are knitted in a circle from the waist down, the legs are knitted in the same way in a circle on the stocking / knitting needles.

We cast on 12O-128-136 (144-152-16O) pe on the 2.5 mm red needles. The beginning of the circle is the center of the back.

3 cm we knit with face stitching. We knit 1 purl circle for the fold line - FURTHER MEASURE THE DETAIL FROM HERE. We will knit 1.5 cm with stitching. On the next 2 round rows we knit holes (see above as). Continue knitting / stitching to 3 cm from the fold line. Switch to 4 mm red knitting needles and continue with pattern A. 1. When 2 circles A.1 have been knitted, start knitting the back lift (see above).

When the lift is complete, continue with A.1 on all hinges again.

Start with one marker thread at the beginning of the circle and one after 6O-64-68 (72-76-8O) sts.

In the next circle, add the 1st loop on each side of both marker threads - see above as (= 4p added. Note: add a loop, knit with pattern A.1). Add this in each 4th circle for a total of 4 times = 136-144-152 (16O-168-176) sts. After the last addition, the height of the part will be about 14-16-18 (19-2O-22) cm from the waist (measured in front).

Leg:

Starting from the center of the back, knit A.1 on the first 68-72-76 (8O-84-88) ne, as before. Remove the remaining 68-72-76 (8O-84-88) pe on a waste thread. Go to 3mm stocking needles and continue with pattern A1. Place a thread marker at the beginning of the circle = inside leg. When 1-1-2 (2-2-2) cm is knitted - decrease the 1st loop on each side of the marker thread - look at the top as (= 2pt decreased). We subtract this way in each 2nd -2nd -2nd (3rd-4th-4th) only 4 times for all sizes = 6О-64-68 (72-76-8О) sts. We switch to a 2.5mm stocking / knitting needle when the leg is 3-4-5 (6-7-7) cm (the deductions should already be completed). We knit 4 face / stitch, 1 purl for the fold line and 4 face stitch. Switch to 3mm stockings / knitting needles and loosely close the loops. The trouser leg will be approx. 4-5-6 (7-8-8) cm from the dividing point to the fold line.

Ru / publ / vjazanie_mal ysham / vjazanie_kombi nezonov_dlja_malyshe j / vjazanyj_komplekt_ dlja_malyshki_vjazan ie_dlja_malyshej / 19- 1-0-398

Joy of life Kit

Age: 5-10 months.
You will need:300 g of orange yarn, 100 g of white and 50 g of pistachio flowers (100% cotton; 250 m / 75 g), 5 white buttons, needles No. 3.
Patterns: according to patterns.

Recommended yarn:Alpina LILY (100% cotton, 50 g / 175 m)
Knitting density:10 x 10 cm = 22 p. X 31 p.

Beanie

Cast on 78 stitches with orange thread and knit 4 p. out. satin stitch, then white thread 3 r. persons. stitch, in the next p. alternate 5 p. persons. satin stitch, 1 yarn over, 2 sts together, 4 p. out. satin stitch. Next, knit with a thread of orange color 4 p. persons. satin stitch, white thread 3 r. persons. stitch, in the next p. alternate 5 p. persons. satin stitch, 1 yarn over, 2 sts together, 4 p. persons. satin stitch. Then knit with an orange thread with pattern 1. At a height of 15 cm, knit 4 p. out. satin stitch - in the 1st and 3rd p. decrease every 2nd p., through the remaining p. stretch the thread and pull it off. Sew cap seams.

Jacket

Right shelf:dial 31 stitches with orange thread and knit 4 p. out. stitch,
then with a white thread 3 r. persons. stitch,
in the next p. alternate 5 p. persons. satin stitch, 1 yarn over, 2 sts together, 4 p. out. satin stitch.
Next, knit with a thread of orange color 4 p. persons. stitch,
white thread 3 r. persons. stitch,
in the next p. alternate 5 p. persons. satin stitch, 1 yarn over, 2 sts together, 4 p. persons. satin stitch.
Then knit with an orange thread with pattern 2, pattern 3, pattern 2, 2 p.
thread of white face. satin stitch, up to a height of 25 cm with a pattern of 1 orange thread, 4 p. thread of white face. stitch, in the next p. alternate 5 p. persons. satin stitch, 1 yarn over, 2 sts together, 5 p. persons. satin stitch, 2 p. persons. satin stitch with orange thread and close p. At a height of 25 cm, close 8 p. for the neckline and 3 times 1 p. each.

Left shelf:knit symmetrically to the right shelf.

Back:dial 62 p. and knit and patterns, both on the shelves and at the height of the front, close p.

Sleeves:dial 47 p. with orange thread and knit 4 p. out. satin stitch, then white thread 3 r. persons. stitch, in the next p. alternate 5 p. persons. satin stitch, 1 yarn over, 2 sts together, 4 p. persons. satin stitch. Next, knit with a thread of orange color 4 p. persons. satin stitch, white thread 3 r. persons. stitch, in the next p. alternate 5 p. persons. satin stitch, 1 yarn over, 2 sts together, 4 p. persons. satin stitch. Then knit with orange thread in pattern 1. Knit straight and at a height of 19 cm close all stitches in one step.

Assembly:perform seams. Along the shelves with an orange thread, dial 41 sts each, knit 5 p. out. satin stitch and close p. In the middle of the plank of the left part, make 4 holes for buttons, the first at a height of 2 cm, the rest at a distance of 6 cm from each other. On the edge of the neckline with an orange thread, dial 66 p., Knit 5 p. out. satin stitch and close p. On the left side in the 3rd p. in the middle of the strip, make 1 hole for the button. Sew buttons opposite the holes.




Panties

Cast on 60 stitches with orange thread and knit 4 p. out. satin stitch, then white thread 3 r. persons. stitch, in the next p. alternate 5 p. persons. satin stitch, 1 yarn over, 2 sts together, 4 p. out. satin stitch. Next, knit with a thread of orange color 4 p. persons. satin stitch, white thread 3 r. persons. stitch, in the next p. alternate 5 p. persons. satin stitch, 1 yarn over, 2 sts together, 4 p. persons. satin stitch. Then knit with orange thread in pattern 1.

At a height of 14 cm for bevels, add on both sides in each 5th p. 4 times, 1 st. At a height of 22 cm, reduce 3 sts on both sides, 1 st. Continue knitting straight to a height of 39 cm, tie 2 cm with a double elastic drawstring and close st. Perform the second leg in the same way. Sew both parts. Insert elastic tape.






It is worn with pleasure by young people. Shorts can be knitted or crocheted. Today we will knit shorts.

Size 34 (36)
For size 36, the data is given in parentheses.

To knit shorts, we need:

Yarn - 200 g (100% cotton; 125m in 50g)
Knitting needles number 2.5 and number 3
Satin ribbon - 1.25 m (width 14 mm)

Basic knitting pattern of shorts

The front surface, knitted with needles No. 3.
Even rows - face loops
Odd rows - purl loops

Knitting density:

26.5 p.X 39 p. = 10 x 10 cm

Openwork pattern

Knits according to the scheme.

The numbers on the right are front rows
Purl rows - knit loops and yarns with purl loops. Repeat the width of the report between the arrows.
The height of the openwork pattern from the 1st to the 9th row

Double plank

From 1 to 4 rows - front surface
5 row - edging * two loops together, yarn * edging
From 6 to 10 rows - front surface

We turn the bar to the wrong side and knit with the front loops together 1 st from the knitting needles and 1 st of the initial row in the next front row.

Description of knitted shorts.

Left front half

We cast on the needles No. 2.5 63 (66) sts and knit a double strap.
We pass to the needles number 3.
We knit 3 r. persons. smooth

From the left edge, add 1 st for a stepping bevel in the 5th and 9th rows from the plank.
From the right edge for side rounding in the 7th p. from the bar, add 1 p.total = 66 (69) p.

Through 3.5 cm = 14 p. from the plank, close 3 loops from the left edge for step rounding, then in every second row 1 time 2 p. and 2 times 1 p.

We knit at the same time:

A) for the bevel from the left edge, we knit two loops together after the edging three times every 10 rows.

B) for a bevel from the right edge, after 11 cm = 44 rows from the plank, subtract 1 p. Then in each 10th row we subtract 2 more times by 1 p, = 53 (56) p.

Through 20 cm = 78 p. from the beginning of the step rounding, perform an openwork row for the drawstring and then knit a double bar. Close the hinges.

Right front half.

We knit symmetrically to the left front half.

Left rear half

Cast on 77 (80) sts on needles # 2.5 and knit a double plank.
We continue to work with knitting needles number 3.
We knit 3 r. persons. smooth
Further 9 rows of openwork pattern. After the lace, we continue to knit with the front satin stitch.

We knit at the same time

A) for a stepping bevel from the right edge, add in the 3rd, 7th and 11th rows from the plank 1 p. = 81 (84) p.
Through 3.5 cm = 14 p. from the plank close from the right edge for a step rounding of 10 loops, then in every second row 1 time 4 p. and 1 time 3 p., 1 time 2 p. and 1 time 2 p. and 3 times 1 p. each.
For a bevel from the right edge, after 16 cm = 62 p. From the plank, subtract 1 p., Then in every 10th p. 2 more times, 1 p.

B) after 16 cm = 62 p. from the plank from the left edge, subtract 1 p., then after 10 rows we subtract one more loop - 54 (57) p.

B) after 18 cm = 70 p. we knit a "dart". To do this, knit the 26th and 27th stitches from the left edge together, then in each 8th row 2 times 2 stitches together before the stitch knitted together at the beginning of knitting the "darts" and twice 2 stitches together after knitted together in a loop at the beginning of knitting "darts"

D) after 18 cm = 70 p. From the beginning of the step rounding, we perform 3 shortened rows after the 12th loop from the right edge, turn the work 1 yarn over and knit a purl row. Further, in each of the next two front rows, knit 12 stitches more, turning the work 1 yarn over and knitting the purl rows.

In each front row, knit the yarn and the next loop together with the front one.
Through 20.5 cm = 80 p. From the beginning of the step rounding, make an openwork row for the drawstring and then knit a double bar. Close the hinges.

Right back half.

We knit symmetrically to the left back half.

Assembling knitted shorts.

We prick the details on the pattern, moisten, leave to dry completely.
We carry out the step seams and the middle seam.
Turn the top strip inward along the fold and sew.
Insert a satin ribbon into the drawstring.

Based on materials from the Verena magazine.

Copyright © Attention! Please do not copy the text without the written permission of the site owner.

Age: for 1.5-2 years

Materials:
250 g of fine green cotton yarn and some blue, orange and yellow yarn,
3 buttons green
55cm linen elastic
knitting needles number 2.5 and number 3
hook number 2

Double set p.: with an auxiliary thread, dial the number of stitches half the required amount + 1 st. Continue knitting with a thread of the main color:
1st p. (person. side): * 1 person., 1 yarn, repeat from * to * to the end of the river. and finish 1 persons.
2nd p .: persons. n. of the lower r. remove, without knitting, the thread before work, yarn over to knit persons.
3rd and 4th p .: double elastic.
After finishing knitting the part, remove the auxiliary thread.

Jacquard pattern: according to the scheme.

Knitting density: 10 x 10cm = 24p. x 33r.

Jumper
Back

Knit crosswise, starting at the right side seam. With a green thread on knitting needles No. 3, dial 44 sts and knit faces. stitch, adding on the right side for the armhole in each 2nd p. 5 times 1 st, then cast on 26 sts = 75 sts and knit straight.

At a height of 9 cm from the start of work, to cut the neckline, subtract from the right side in every 2nd p. 3 times 1 p. = 72 p.

After 6 cm from the beginning of the neckline, close 28 p. To cut the neckline, which should be recruited in the next p. and continue knitting symmetrically.

Total height 30 cm.

Front
Knit like a back. At a height of 9 cm from the beginning of knitting, close 7 sts for the neckline on the right side and then subtract in every 2nd p. 5 times 1 p. = 63 p. And knit a jacquard pattern.

Sleeves
With a green thread on knitting needles No. 2.5, in a double set, cast on 22 sts = 43 sts and tie 2 cm with 1x1 elastic band.

Continue knitting with knitting needles # 3. satin stitch, evenly adding in the 1st p. 4 p. And adding on both sides in each 2nd p. 2 times 1 p. = 51 p.

At a height of 5 cm from the beginning of knitting, subtract sleeves on both sides in each 2nd p. 3 times in 1 p., Then close 6 times in 3 p. And the remaining 9 p.

The total height is about 11 cm.

Rubber bands
For the bottom edge, knit 2 pieces. With a green thread on knitting needles No. 2.5, dial 38 sts = 75 sts with a double set, tie 4 cm with an elastic band 1 x 1 and close sts according to the figure.

Perform the elastic for the neckline in the same way, dialing 47 sts = 93 sts and tying 2 cm with a 1x1 elastic band.

Assembly
Sew elastic bands to the bottom edge of the jumper and tape to the neckline. Sew and sew the sleeves into the armholes. Crochet the cut of the neckline on the back with a green thread 2 r. Art. b / n, performing in the 2nd p. on the left side there are 3 holes for buttons (1 st, skip 1 st): the first is about 1 cm from the top edge and the rest - at intervals of 3 cm. Sew on the buttons.

Shorts
Back and front details

Knit in one piece, starting at the back. With a green thread on needles No. 2.5, cast on 71 sts and tie 2 cm with a double elastic band. Continue knitting with knitting needles # 3. satin stitch.

At a height of 19 cm from the beginning of knitting, close on both sides in each 2nd p. 2 times 5 sts and 5 times 4 sts = 11 sts. Tie 6 p. straight and dial on both sides in each 2nd p. 5 times 3 sts, 7 sts and 8 sts = 71 sts. Tie 17 cm straight, then 2 cm with a double elastic band and close the sts according to the pattern.

Total height approx. 48 cm.

Rubber bands
Tie 2 parts. With a green thread on knitting needles No. 2.5, double set on 36 sts = 71 sts, tie 2 cm with an elastic band 1 x 1 and close sts according to the figure.

Assembly
Sew side seams. Sew the elastic to the bottom edge of the leg. Thread an elastic band into the drawstring of the belt.